Water Master Plan

BACKGROUND

The City of Toledo owns and operates a water system with in-service components dating back to the 1930’s. The City provides water to residential, commercial and industrial customers within the 2630-acre Urban Growth Boundary (UGB) and is a wholesale supplier of treated water to the Seal Rock Water District. The 2010 Water Master Plan investigated the needs within the current UGB, plus areas encompassing the raw water supply and transmission facilities for a 20-year period into the future, ending in 2030. The Water Master Plan assessed current water demands, existing infrastructure, as well as future needs. The complete report can be found at, Toledo Water Master Plan 2010.

In 2010, the City of Toledo obtained a revenue bond in the amount of $6.5 million, for Phases I and II for the Water Master Plan improvement. The various improvements in the Water Master Plan are prioritized and separated into four separate phases. Progress in the various projects within Phase I and II can be seen below.

 

Water Master Plan Improvements

PHASE I
Skyline Drive 1.9 MG Storage Tank

 

water tank

IMG_1556IMG_1563IMG_1608

 

Phase I Distribution Improvements

Highway 20 to Sturdevant waterline

20 20A 20B

studevant3 sturdevant1 sturdevant2

SE 5th and Beech Loop

IMG_1559 IMG_1538 IMG_1534

Wagon Road and Arcadia

IMG_1543 IMG_1579

Skyline tie-in for new Water Tank

IMG_1570 IMG_1602 IMG_1552

Sturdevant, Fircrest and 10th NE

IMG_1574 IMG_1576 IMG_1621

Burgess and 10th NE

IMG_1595 IMG_1600 IMG_1601

 

PHASE II

Water Treatment Maintenance Improvements

IMG_0060 IMG_0062 IMG_0072

IMG_0126 IMG_0128 IMG_0125

IMG_0120 IMG_0131 IMG_0133

 

 

Siletz River Intake and Pump Station

New Intake Drone 3 IMG_0001

IMG_0011 IMG_0075 IMG_0142 IMG_0141 IMG_0080

 

Olalla Reservoir Pipeline Crossing

IMG_0115 IMG_0136 IMG_0137 IMG_0138